OUR REQUEST:
On behalf of Rethink Basque Ranch and the surrounding communities, we respectfully request that the Ada County Highway District requires the construction of the complete east-west transportation corridor, including
Joplin Road and Duck Alley, as a condition of transportation mitigation for the proposed IBAIA (Aldape/Basque Ranch) development.
Our request is based upon the Meridian Fire Department’s formal review of the proposed development. During its review, the Fire Department concluded that the current roadway configuration does not provide adequate emergency access and determined that additional access roads are necessary before development can proceed.
BACKGROUND
Currently, Brighton plans to use Black Cat Road and Jayker Way as the only two access points into the proposed 300 acre, 471-unit portion of the IBAIA development planned for the City of Meridian Area of Impact. [Another 850 homes are expected to be built in City of Star’s Area of Impact.]
During its review of the project, the Meridian Fire Department identified significant concerns regarding emergency access, emergency response reliability, and resident evacuation relative to the Brighton/IBAIA development.
These concerns resulted in multiple written comments requiring additional information and requirements from Brighton before development can move forward.
June 15, 2026 – Meridian Fire Department Identifies Emergency Access Concerns for IBAIA Project
In a June 15 email Meridian Deputy Chief/Fire Marshal Stephen Taulbee
stated:
“I spoke at length with Brighton last week regarding this project so that I could obtain additional context and information about what is being proposed and the impact to Fire and Emergency services response into the area.
After some further evaluation and site visits, Meridian Fire has concerns as it relates to access into and out of the area for Fire and Emergency Services. I will work with Chief Blume on drafting official comments for this proposed project.”
This communication confi rmed that Meridian Fire had identifi ed signifi cant concerns regarding emergency access into and throughout the proposed IBAIA development.
June 20, 2026 – IBAIA’s Proposed Fire Access Does Not Meet International “Remoteness” Fire Code
Following additional fi eld review and consultation with Meridian Fire operations personnel, Deputy Chief Taulbee informed Brighton Homes that the proposed access configuration does not comply with the 2018 International Fire Code Appendix D, Section D107.2 (Remoteness).
Deputy Chief Taulbee stated: “Based on what is proposed, the two Fire Department Access points for ingress and egress into and throughout the proposed development do not meet the criteria as outlined in the 2018 IFC, Appendix D, Section D107.2 Remoteness.
Fire Access Roads must be separated by enough distance to avoid a situation where both can become blocked or unavailable simply because they are too close to one another. What is currently proposed, creates this situation for Fire and Emergency services.
Deputy Chief Taulbee recommended that Brighton prepare a revised Fire Department Access Exhibit that complies with the International Fire Code.
July 15, 2026 – Meridian Fire Department Requires Additional Fire Access Before Development Can Proceed
On July 15, 2026, Meridian Deputy Chief/Fire Marshal Stephen Taulbee submitted a formal review comment to the City of Meridian regarding the preliminary plat application.
Deputy Chief Taulbee stated: “Provide a Fire Department Access exhibit that includes the entirety of the proposed preliminary plat as shown in the Concept Plan for the development (service area) as included in this application. Based on the potential for the impairment of the proposed fi re access routes, additional fi re access roads shall be required before any development can proceed.
The Fire Department Exhibit that was provided indicates additional access through Joplin and Duck Alley.
Fire Department Access through Duck Alley shall be required for any future development, given the potential for impairment of the Fire Access Roadways due to vehicle congestion, gate access delays, terrain conditions, climatic conditions, and other factors affecting fi re and emergency services access and reliable routes for resident evacuation impacted by Fire and Emergency Services responses and incidents to all areas being served.
These comments Reference 2018 International Fire Code, 503.1.2. and 2018 IFC Appendix D.”
The Meridian Fire Department’s review clearly establishes that the proposed roadway system is insufficient to safely serve the development and specifically identifies Joplin Road and Duck Alley as necessary emergency access routes.
Why This Matters to ACHD
While the Meridian Fire Department’s review was conducted from the perspective of emergency services, the same roadway improvements provide substantial transportation benefits that fall within ACHD’s responsibility to review and mitigate.
Completion of the Joplin Road and Duck Alley corridor would:
* Improve east-west connectivity.
* Reduce reliance on Black Cat Road as the primary access route.
* Help mitigate significant known traffic issues on Tree Farm/Jayker Way
* Improve traffic distribution across the surrounding roadway network reducing reliance on Black Cat Road and Jayker Way as the only access points to IBAIA’s Meridian development.
* Increase roadway redundancy during collisions, construction, flooding, or other roadway closures.
* Improve emergency response times and resident evacuation options.
* Enhance long-term mobility for both existing and future residents.
These are fundamental transportation planning objectives that align with ACHD’s mission of providing a safe, efficient, and connected transportation system.
Our Request:
Based on the Meridian Fire Department’s July 15, 2026 review comments, we respectfully request that ACHD require, as a condition of transportation mitigation for the proposed IBAIA (Aldape/Basque Ranch) development, the construction of the complete east-west transportation corridor, including both Joplin Road and Duck Alley.
The Meridian Fire Department has concluded that additional access roads are necessary before development can proceed. Because these same roadways also provide critical transportation connectivity, traffic distribution, emergency access, and evacuation benefi ts, we believe they should be constructed as part of the initial transportation mitigation required for the development rather than deferred to an undefi ned future phase.
Humbly submitted,
Jack Van Berkel – President
Victor Miller – Vice President
Craig VonDemfange – Treasurer
Doug Hastings – Founding Member
Rethink Basque Ranch
4700 North Linder Road – Suite 156A-223
Meridian, ID 83646
CC:
Kendra Conder – District 3 Development Services Coordinator – Idaho Transportation Department
Brian Duran – Planning Manager Transportation – Idaho Transportation Department
Robert Simison – Mayor – City of Meridian
Brian Whitlock – Meridian City Council – District 1
Liz Strader – Meridian City Council – District 2
Doug Taylor – – Meridian City Council – District 3
John Overton – – Meridian City Council – District 4
Anne Little Roberts – – Meridian City Council – District 5
Luke Cavener – – Meridian City Council – District 6